Project Description

The project limits consist of Alfred Street East from the O’Brien Street North to Angus Campbell Drive.

The anticipated scope of works include asphalt removal and replacement, shouldering, ditching, driveway/entrance reinstatements, landscaping reinstatement, and line painting.

Traffic Impacts

Traffic disruptions and detours may occur.

Status

Ongoing.

Schedule

Asphalt removal and replacement works will commence the week of July 8 and all project works are anticipated to be completed by early August.

Project Contact

Paul Champagne

Supervisor of Roads & Fleet

613-735-6821 ext. 1415

Project Description

The works include the removal and replacement of all components within the existing structure and the installation of a grinder. Electrical works will also be completed on existing wiring and controls and upgrades with a new panel. The works will require the removal of the existing structure top section and the rebuilding of the pump station structure top section including new access hatches. Contract includes reinstatement of gravel and landscaped areas at the site. By pass pumping will also be included in the scope of this project.

Traffic Impacts

Minor traffic disruptions may occur at the cul de sac at the end of Crandall Street.

Status

Ongoing.

Schedule

Works will commence mid-summer and continue into the fall.

Project Contact

Marielle McLaughlin
Manager of Operations

613-735-6821 ext. 1402

Project Description

The works include the removal of the existing asphalt and sidewalk with the replacement of the existing watermain and City owned portion of water services. Work will include full depth road reconstruction, asphalt gutters, paving works, concrete sidewalk installation, structure adjustments, and landscaping reinstatements. Temporary water to the residents on Dickson Street will be a requirement for this project.

Traffic Impacts

Traffic disruptions will occur along Dickson Street between Mackay Street and the entrance to Pansy Patch Park. Lane closures will be in effect throughout the project.

Status

Ongoing.

Schedule

Works will commence early August and continue into the fall.

Project Contact

Marielle McLaughlin
Manager of Operations

613-735-6821ext. 1402

Project Description

The works include the removal of the existing asphalt and sidewalk with the replacement of the existing watermain, sanitary and storm sewer systems and City-owned portion of individual property services. Works will include full depth road reconstruction, concrete curb and gutter installations, paving works, concrete sidewalk installation, structure adjustments, and landscaping reinstatements. Temporary water to the residents on Moffat Street and portions of Isabella Street will be a requirement for this project.

Traffic Impacts

Traffic disruptions will occur on Moffat Street between Renfrew Street and Mary Street. Lane closures will be in effect throughout the project.

Alternate drop off and pick up locations have been coordinated with the Renfrew County Joint Transportation Consortium and the Principal/Director for Cathedral and Wise Owl Daycare.

Status

Ongoing.

Schedule

Works will commence mid-August and continue until mid-November.

Project Contact

Marielle McLaughlin
Manager of Operations

613-735-6821ext. 1402

Project Description

The project limits consist of McGee Street between Boundary Road and James Street.

The anticipated scope of works will include asphalt removal and replacement, asphalt gutter installations, shouldering, ditching, culvert replacements, driveway/entrance reinstatements, landscaping reinstatement, and line painting.

Traffic Impacts

Traffic disruptions and detours may occur.

Status

Ongoing.

Schedule

Asphalt removal works are anticipated to commence mid August. Ditching works and culvert replacements will then be completed prior to the placement of the final lift of asphalt.

Works will commence in mid August and be completed by mid to end September.

Project Contact

Paul Champagne
Supervisor of Roads and Fleet
613-735-6821 ext. 1415

Project Description

The project limits consist of Miller Street between Munro Street and Christie Street.

The anticipated scope of works will include asphalt removal and replacement, concrete curb and gutter replacements, sidewalk panel removal and replacement, driveway/entrance reinstatements, landscaping reinstatement, and line painting.

Traffic Impacts

Traffic disruptions and detours may occur.

Status

Ongoing.

Schedule

Asphalt removal works are anticipated to commence September 8, 2025. All works are anticipated to be completed by the end of September.

Construction works may occur on the weekends during the month of September.

Project Contact

Marielle McLaughlin
Manager of Operations

613-735-6821ext. 1402

Project Description

The project limits consist of Paul Martin Drive from the City limits (at approx. International Drive) to Townline Road, as well as Boundary Road from the bridge to Paul Martin Drive and Mud Lake Road from City limits to Paul Martin Drive.

The anticipated scope of works include asphalt removal (either milling of top lift or complete removal) and asphalt replacement, shouldering, ditching, culvert installations, driveway/entrance reinstatements, landscaping reinstatement, and line painting. Bridge works will also be completed as part of this project.

Traffic Impacts

Traffic disruptions and detours may occur.

Status

Ongoing.

Schedule

Paving works are anticipated to commence mid September with works being completed by the end of November.

Dependent on material availabilities, bridge works may be completed in the Spring of 2026.

Project Contact

Marielle McLaughlin
Manager of Operations

613-735-6821ext. 1402

Contact Us

Manager of Operations

460 River Rd.
Pembroke, ON
K8A 1A1

Phone 613-735-6821 ext. 1402
Email

Roads and Fleet

460 River Rd.
Pembroke, ON
K8A 1A1

Phone 613-735-6821 ext. 1409
Email